Skip to main content

Project handover

Hand the site over with a report in hand.

What works, what to fix and what to test by hand.

Report link on every plan

new-site.comExample

Handover, Sep 30, 2026

  • Performance86Passed
  • SEO94Passed
  • Accessibility882 manual tests
  • Security811 fix
  • Ecology79Passed

Report link, 12 URLs, Standard

The situation

“Ready” needs an agreed scope and supporting evidence.

The client and delivery team need the same scope, criteria and results. An Insight report provides a technical reference. Acceptance still depends on the agreed tests and the parties’ decision.

Today

  • Each side of the dispute brings a different report and thresholds.
  • Date and scope are missing, so nobody knows what the handover covered.
  • Automated signals get mixed with expert requirements.

With Insight

  • Every module’s result with date and scope
  • A list of fixes before sign-off
  • A separate list of things to check by hand

Project stages

One measurement from quote to ongoing care.

This scenario is one of five stages. The same audit runs at each one, so results compare.

  1. Before the project
  2. During the project
  3. After launch

How it works

Three steps, one result.

You end up answeringWhat does the audit confirm, and what needs a fix or manual test?

  1. Agree on the handover scope

    Settle the URLs and criteria with the client before you run the audit.

  2. Save the dated result

    The report carries a date, scope and sources, so both sides look at the same thing.

  3. Add manual tests

    Some criteria, such as keyboard use, need a person. Insight shows where.

What you get

A dated handover report with a manual test list

One document with a date, scope and sources. Share it with a link; the recipient needs no Insight account.

See a sample handover report
Have ready
  • Agreed URLs for handover
  • Criteria set before the audit
  • Someone to run manual tests

Report link on every plan

Limits

What Insight will not do here.

An automated audit is a starting point. What it cannot see stays with you.

Outside the audit
  • It does not replace the sign-off record or contract decisions.
  • It does not certify accessibility or security.
  • It does not close handover without manual tests.
Methodology and analysis scope

What you use

Modules and industries for this scenario.

The Insight areas this scenario uses most, and the industries where it comes up most.

Run handover on shared thresholds.

The Free plan needs no card. Comparisons and result history are on paid plans.

  1. 1 Agree on the handover scopeSettle the URLs and criteria with the client before you run the audit.
  2. 2 Save the dated resultThe report carries a date, scope and sources, so both sides look at the same thing.
  3. 3 Add manual testsSome criteria, such as keyboard use, need a person.